Loading prices...

Register/Sign in
ScrapMonster

Brazos Electric Co-Op Inc
4600 Cobbs Drive, Waco, Texas, United States

Memberships : NA
Industry : Electric Power
Basic Member
Since Jan, 2017
About Company

The Brazos River Authority exists to develop, manage and protect the water resources of the Brazos River basin.

As a river cuts a path through the heart of Texas, it provides a water source for thousands of homes and businesses.

The Brazos River and its tributaries begin as a trickle in the west and gain momentum as the river heads south. By the time it reaches the Gulf of Mexico, the Brazos River basin has provided billions of gallons of water each year for cities, agriculture, industry and mining. Recreational opportunities - such as boating, swimming and fishing - are abundant.

The Brazos River Authority was created by the Texas Legislature in 1929 and was the first state agency in the United States created specifically for the purpose of developing and managing the water resources of an entire river basin. Today, the BRAs staff of more than 200 develop and distribute water supplies, provide water and wastewater treatment, monitor water quality, and pursue water conservation through public education programs.

Although the Brazos River Authority is an agency of the State of Texas, it does not levy or collect taxes. Except for occasional governmental grants to help pay the costs of specific projects, the BRA is entirely self-supporting; maintaining and operating reservoirs and treatment systems using revenues from the customers it serves.

Message from the General Manager

Nearly two decades ago, the state’s water planning process brought to light a frightening fact: by the year 2050, the State of Texas will not have enough water to meet the needs of everyone living within its borders unless additional water supplies are developed.

With a mandate from the state to find new water resources, the 16 water planning regions studied, among other things, options for building new reservoirs. These studies uncovered common hurdles to reservoir development, including: a lack of suitable locations with land availability and a resounding response of “not in my back yard!” from residents.

In light of this critical shortfall, the Brazos River Authority Board of Directors recognized the need to increase water supplies and assigned staff the responsibility of researching new ways to more efficiently use the water already available in our current system of reservoirs.

Staff, along with consulting engineers and hydrologists, brainstormed the issue, in search of viable alternatives. After a great deal of research it was determined, using advanced water availability modeling, there was actually more water that could be made available within the Brazos River basin than BRA’s existing water rights allowed. By utilizing the water collectively within our 11-reservoir system in concert with runoff downstream, and accounting for water being returned into the river from treatment plants, more supply might be utilized. This plan provides for additional water resources, without having to construct heavy infrastructure such as dams, reservoirs, and pipelines. From this, the idea for the Brazos River Authority’s System Operation Permit was formed.

The BRA filed a permit application with the Texas Commission for Environmental Quality in 2004. It was the first of its kind for the state and one that was expected to receive a great deal of scrutiny. In light of the innovative nature of this application, the BRA Board of Directors and staff anticipated the permitting process to be thorough and painstaking; however, at the same time, we had hoped to obtain a permit to provide additional water supply for the Brazos basin within 3 to 5 years.

The BRA worked with TCEQ, Texas Parks and Wildlife Department, and numerous other organizations and agencies to address the many questions, concerns and doubts raised by the System Operation Permit. Two different hearings, involving a variety of interests, also thoroughly debated the merits of all elements of the Permit.

Finally, in August 2016, TCEQ issued the final permit. The permit was issued with a requirement for a study to determine whether the 2011 – 2015 drought was a new drought of record for the Brazos river basin, and if so, to determine the impacts on the amount of water authorized for use under the permit. The results of the drought study may change the amount of water ultimately authorized by the permit; however, the BRA still expects that a significant quantity of additional water may soon be made available to entities on the BRA’s waiting list.

The System Operation Permit will not be able to satisfy all of the requests for water that are currently on hand. Therefore, looking further into the future, the BRA is preparing to move forward with our next water supply project. Allens Creek Reservoir, a proposed off-channel water supply facility, has been in the planning process since the early 1970s. For this project, two of the three requirements to build a reservoir in Texas have been obtained: the purchase of land and a permit from the state. The remaining prerequisite, a federal 404 Permit from the US Army Corps of Engineers, requires numerous studies and the opportunity for public comment. We hope to update you on the progress of these studies in 2017, as we move toward the construction of the first major reservoir in the Brazos River basin since the late 1970s.

Whether building a reservoir or permitting water that modeling shows is already available, water development initiatives are both time-consuming and expensive; however, as our planning process has shown us, these efforts are necessary for the future of Texas.

Company NameBrazos Electric Co-Op Inc
Business CategoryElectric Power
Address4600 Cobbs Drive
Waco
Texas
United States
ZIP: 76710
PresidentNA
Year EstablishedNA
EmployeesNA
MembershipsNA
Hours of OperationNA
Company Services
  • Electric Power Services
Phone NumberLocked content Subscribe to view
Fax NumberLocked content
EmailLocked content
WebsiteLocked content
NamePositionContact DetailsSubscribe to view
***General Manager/CEOLocked content
Not available
Not available
Company Review
Start your review of Brazos Electric Co-Op Inc
Electric Power Companies
Companies in United States

Contact Company

By continuing you agree to the Terms & Conditions and Privacy Policy of this website
×

Quick Search

Advanced Search