SCRAP METAL PRICES United States North America China India Europe Metal Exchange Prices Steel Prices Marketplace Scrap Sell Offers Scrap Buy Requests NEWS Waste & Recycling Metals & Steel Precious Metals Mining Companies Waste & Recycling Mining Metals Yard Finder USA Scrap Yards Canada Scrap Yards Scrap Yard Prices Equipment Events Press Release Coin Values Metal Finish Finish Plastics Data Subscriptions Scrap Materials Laws & Regulations Answers Jobs
Sell Your Junk CarGet an instant quote for your car on ScrapMonster.com

KEM Electric Coop Inc

107 S. Broadway, P. O. Box 790, Linton, North Dakota, United States | Electric Power

Two aspects of a cooperative make us different from other types of utilities.

At KEM Electric Cooperative members are owners in the cooperative. We exist because of you.

We were formed to bring safe, affordable and reliable energy and services to our members--it's our mission and purpose.

Our members elect 7 fellow members to represent them on the board of directors, maintaining democratic control of the cooperative.

We are local. Our headquarters in Linton, ND and outpost in Steele, ND serve approximately 2,140 members / 3,795 meters in Kidder, Emmons, McIntosh, Logan, and Burleigh counties.

We maintain 3,015 miles of line, with 537 of those miles being underground.

Mission Statement

The purpose of KEM Electric is to make its members more productive and increase their quality of life.  This will be accomplished by:

  • Providing safe, reliable, quality electric service.
  • Providing other services that will benefit the membership.

KEM Electric Cooperative, Inc. 1944-1985

KEM Electric Cooperative, Inc. was organized in 1944, during World War II, some nine years after the birth of Rural Electrification Administration (REA).  The date of incorporation was April 5, 1944.

The original or charter Board of Directors was made up of the following nine dedicated men: S. R. Dosch, Strasburg; Wendelin Wikenheiser, Strasburg; Carl Jacobson, Braddock; Kenneth R. Lynn, Ashley; Art Forsberg, Kintyre; Garret Vander Vorst, Westfield; Fred J. Ohlhauser, Linton; Joseph Vetter, Linton; and Herbert Weber, Hazelton.  These men and long-time Emmons County Extension Agent Ben Barret were the driving force in creating KEM Electric and in bringing electricity to the rural areas of south central North Dakota.

The name chosen, KEM Electric Cooperative, Inc., uses the initials of three of the counties in the service area, Kidder, Emmons and McIntosh.  Logan County was added later to the service area but not to the name.

Pius K. Mastel, Linton was hired in October, 1946 as Coordinator.  The title of the position was eventually changed to General Manager.

It was impossible to obtain construction materials during World War II and as a result actual construction of power lines did not begin until 1947 and 1948.

KEM’s first substation (Danzig) was energized April 2, 1949.  The Danzig sub is approximately eight miles south of Wishek, in McIntosh County.  The first farm energized was that of Wm. C. Giedt, Danzig.  The farm was connected April 2, 1949.

By April, 1950, three additional substations had been energized.  These were Dawson, Napoleon and Linton subs.

On March 1, 1950 George W. Cornog replaced P. K. Mastel as KEM’s General Manager.

Construction continued at a fast pace for some time.  In 1952, the last large section of new lines—the E-2 section—was completed and in 1953 the E-3 section was also completed, picking up individual farms scattered around the entire service area. 

KEM’s basic electric system remained the same, in large part, until 1965.  By then increased demand and usage of electric energy by the members brought about a major rebuilding program.  Additional distribution substations were constructed, existing feeder lines were rebuilt increasing their capacity, new feeder lines and new transmission lines were built, and an extensive undergrounding of lines was accomplished.

The system now consists of twelve distribution substations—Danzig, Linton, Napoleon, Sukut, Krassna, Steele, Tappen, Hazelton, Ashley, Zeeland, Sunburst and Midway.  The Dawson sub was retired and the original wooden structures of the Danzig and Napoleon substations were replaced with modern steel structures.  In addition, KEM Electric constructed a large 230/41.6 kV transmission substation, the Herbert Weber Substation, at Dawson.  This facility is connected directly to the Western Area Power Administration transmission line and was added to provide much needed additional capacity in the northern portion of the service area.  The substation, named in honor of Charter Board Member Herbert Weber, is owned by KEM Electric but operated by Montana-Dakota Utilities Company, Bismarck.


Company Details
Company NameKEM Electric Coop Inc
Business CategoryElectric Power
Address107 S. Broadway
P. O. Box 790
Linton
North Dakota
United States
ZIP: 58552-0790
PresidentNA
Year EstablishedNA
EmployeesNA
MembershipsNA
Hours of OperationMonday-Friday :8:00 am–4:30 pm
Contact Company






Similar Companies

Plastic Keychain Magnet

Keychain Magnets as gift items to promote your Scrap Metal Recycling business!. Letters and numbers can be imprinted. Available Colors: Red, Blue and Green

$2.59

Buy Now

Scrap Metal Test Magnet 10 lb N52 Neodymium Rare Earth

Retrieval and Metal Testing Magnet. Contains The Most Powerful Grade of Neodymium Rare Earth Magnet (N52). Case Material: Aluminum

$9.99

Buy Now